Turn parking minutes into revenue
Retail and commercial parking sites monetise dwell time — AC 7.4–22 kW for the long shop, compact DC 30–160 kW for the quick stop, all with OCPP billing.
Charging alone doesn't pay — footfall does.
Direct margin only 40–60%
Charging revenue on its own delivers a 40–60% direct margin; the rest of the value is the customer you've kept in the store for 30–120 minutes longer.
0.5–2 hours decides the charger
A 30-minute grocery trip and a two-hour mall visit need different power. Match the charger to dwell time or you over-build or under-serve.
Most cost sits off-charger
Civil work, cabling and the grid connection usually cost more than the charger. Smart load balancing avoids the upgrade that blows the budget.
Three capabilities, matched to the visit.
AC 7.4–22 kW + compact DC
AC ports for the 0.5–2 hour dwell, a 30–160 kW DC bay for the quick top-up — 1–3 AC sessions and 3–10 DC sessions a day.
Dynamic load balancing
Shares the existing connection across ports so you never pay for a grid upgrade the site didn't need.
OCPP billing & MID metering
Charge per kWh with MID-certified metering, loyalty discounts and parking validation — all from one dashboard.

AC for the shop, DC for the stop.
A mixed AC + compact DC layout matches every visit length and keeps the grid connection modest. Billing and loyalty sit in the OCPP platform, not a third-party bolt-on.
- Dwell-time-matched mix — AC wallbox and pedestal for long stays, compact DC for the 20-minute stop.
- Load balancing across ports keeps peak draw inside the existing connection.
- OCPP 1.6J / 2.0.1 billing with MID metering, RFID and app payment.
Compliant, safe and easy to insure.
CE and UL 2594 for the AC line, UL 2202 for DC, MID-certified metering for revenue billing and ENERGY STAR low standby.

Made for retail frontage
A 10-inch touchscreen, contactless payment and RFID reader give shoppers a self-serve session while they browse.
See the DC rangeParking that paid for itself.
EV drivers visit 45% more often than fuel customers and spend 25% more on food — the charger is the draw, the basket is the margin.
Mixed AC + compact DC keeps a site under its existing connection while still serving both the weekly shopper and the 20-minute top-up.
Turn parking minutes into revenue.
Tell us your parking layout, visitor dwell time and available power — we design the AC + DC mix and billing, and reply within 48 hours.
Get a retail quote