ems-charge factory production line
Home / Company / Capabilities

Your brand, our power electronics

Four OEM/ODM tracks — from a 300-unit white-label to a full-custom power stage — each with a defined MOQ, lead time and certification path. You bring the brand and the market; we bring the engineering and the line.

ems-charge OEM customization workshop with enclosure samples and engineering drawings
OEM / ODM

Customization without the gamble.

We publish our MOQs and lead times up front because a bad-fit engagement wastes your capital and our line time. Pick the track that matches your market speed and budget.

  • White-label rebrands a proven catalog SKU in 4–8 weeks — the fastest way to test a market.
  • Firmware ODM gives you custom UI, RFID and OCPP logic without touching hardware.
  • Full-custom OEM builds a new power stage and enclosure to a spec not in any catalog.
  • SiC power electronics in every track keep system efficiency 5–10% above IGBT designs.
Engagement models

Four tracks, one accountable partner.

ModeMOQEx-factoryWhat you get
White-label300 units / SKU4–8 weeksProven catalog SKU with your logo and color
Firmware ODM50–200 units8–14 weeksCustom firmware, UI, RFID and OCPP logic
New-mold ODM50–200 units14–22 weeksCustom enclosure on your own tooling
Full-custom OEMProject-based36–54 weeksNew power stage + enclosure to your spec
DC project config1 unit8–14 weeks30–360 kW configured to the site
Annual framework1,000+ / yearRollingCommitted capacity and pricing
Customization

What you can change.

Enclosure & housing

Sheet-metal or injection-molded housings, IP54/IP65 rated, in your form factor.

Branding & logo

Silkscreen, laser etch and custom color on faceplates and cables.

Firmware & UI

OCPP profile, RFID/App flow, dynamic load balancing and screen layouts.

Connectors

CCS1/CCS2/CHAdeMO/GB-T and Type 1/Type 2, matched to your region.

Certification

CE, UL/ETL and FCC filings run against your exact production unit.

Packaging & manuals

Retail boxes, multilingual manuals and your brand on the pallet.

Lead times

Factory gate to your warehouse.

ModeEx-factoryEurope doorNorth America door
White-label4–8 weeks9–15 weeks10–16 weeks
Firmware ODM8–14 weeks13–21 weeks14–22 weeks
New-mold ODM14–22 weeks19–29 weeks20–30 weeks
Full-custom OEM36–54 weeks41–61 weeks42–62 weeks
Certification on your behalf

We run the paperwork, you hold the mark.

Certification costs are itemised in the quote, not buried in the unit price. Each filing runs against your exact production configuration.

CertificationMarketCostTimeline
CE (LVD + EMC + RED)EU$8,000–25,0008–16 weeks
ETL (AC)North America$15,000–35,00012–20 weeks
ETL (DC)North America$25,000–60,00016–28 weeks
OCPP 2.0.1Global$2,000–5,0004–8 weeks
UL 2594 / 2202North AmericaOn request16–30 weeks

Bring us your spec, or your brand.

Tell us your market, volume and customization needs — we return the right OEM/ODM track, MOQ, lead time and certification cost within 48 hours.

Send Inquiry
Get Quote